Work package 1
Define material, component, and system specifications to ensure comparable measurements and meet use case requirements.
Work package 2
Design a compact optical and mechanical system for sample and diamond integration, and develop tailored SPAD and microwave components to meet performance requirements.
Work package 3
Develop and provide CVD-grown diamond membranes (<100 μm) with activated NV centres, optimizing thickness, nitrogen concentration, and crystal orientation ((100), (111), (110)).
Work package 4
Assemble widefield magnetometers tailored for graphene and corrosion analysis, as well as magnetic material characterization and tumor cell identification.
Work package 5
Use cases: Acquire high-resolution images to analyze defects in graphene, corrosion and cracks in metals, magnetic quality control in micromagnets, and intracellular changes to distinguish tumor from non-tumor cells.
Work package 6
Development of a data processing suite for widefield imaging magnetometers with tailor-made routines to automate measurement, evaluation, and detection of target variables.
Work package 7
Contribution to CEN/CLC JTC-22 WG2 by the consortium representative, focusing on standardizing measurements, components, and the data format for magneto-imaging.
Work package 8
Increase public awareness of NV-based quantum sensors, maximize the consortium's impact through IPR monitoring and exploitation plans, and develop industrialization and commercialization roadmaps for PROMISE prototypes to ensure early market adoption.
Work package 9
Coordination of participant actions, progress monitoring for project goals, administrative management, and providing a reliable interface to EC services.
January 1th 2025
Kick-off meeting
March 31st 2025
Use case requirements gathered to delimit the system specifications.
February 28th 2026
Instrument components ready for integration
August 30th 2026
First versions of prototypes ready
February 28th 2027
First imaging reports with procedures for all use cases
February 29th 2028
Final prototypes ready for validation.
August 31st 2028
Final results of the PROMISE project with exploitation and commercialization routes selected